Aqaba Oil Terminal Rehabilitation Project

 

g1

  • All civil works and steel structure fabrication and erection  for Crude oil pump station # 1& 2  include 11 pumps and 2 for future, and infrastructure trenches with services.
  • All civil works and steel structure fabrication and erection  for substation building and infrastructure trenches.
  • 2 No of Steel platform jetty between jetty head and mooring dolphin with concrete brackets.
  • Install 4 loading arms 29 meter length at jetty head.
  • 4km Crude oil pipe line concrete pipe rack with sleepers.
  • Roads and infrastructures.
  • Concrete tanks and aprons.
Client ADC ( Aqaba Development corp.)
Commencement Jan 2014
Completion March 2015
Project Cost 53.0 million JD / Our scope 4.2 million
Location Oil terminal port - Aqaba