- All civil works and steel structure fabrication and erection for Crude oil pump station # 1& 2 include 11 pumps and 2 for future, and infrastructure trenches with services.
- All civil works and steel structure fabrication and erection for substation building and infrastructure trenches.
- 2 No of Steel platform jetty between jetty head and mooring dolphin with concrete brackets.
- Install 4 loading arms 29 meter length at jetty head.
- 4km Crude oil pipe line concrete pipe rack with sleepers.
- Roads and infrastructures.
- Concrete tanks and aprons.
| Client | ADC ( Aqaba Development corp.) |
|---|---|
| Commencement | Jan 2014 |
| Completion | March 2015 |
| Project Cost | 53.0 million JD / Our scope 4.2 million |
| Location | Oil terminal port - Aqaba |