g11-Design and Built Marina, Jetty for Al-HAQ hotel beach, build Breakwater and Dredging
2-Quay wall concrete blocks
3-built a new breakwater and rock beach protection from waves.
4-Supply new floating pontoon and jet ski.
5-Concrete ramp for boats.
6-Dredging 45000cu.m .
7-Jetty on piles

Client AL-HAQ Hotel - Aqaba
Commencement Jan 2019
Completion February 2020
Project Cost 2,8 million JD
Location Aqaba south beach

 

g1

  • All civil works and steel structure fabrication and erection  for Crude oil pump station # 1& 2  include 11 pumps and 2 for future, and infrastructure trenches with services.
  • All civil works and steel structure fabrication and erection  for substation building and infrastructure trenches.
  • 2 No of Steel platform jetty between jetty head and mooring dolphin with concrete brackets.
  • Install 4 loading arms 29 meter length at jetty head.
  • 4km Crude oil pipe line concrete pipe rack with sleepers.
  • Roads and infrastructures.
  • Concrete tanks and aprons.
Client ADC ( Aqaba Development corp.)
Commencement Jan 2014
Completion March 2015
Project Cost 53.0 million JD / Our scope 4.2 million
Location Oil terminal port - Aqaba

 

g1

  • All Steel structure , supply, fabrication, erection for shaded areas .
  • Pipe steel supports and sleepers .
  • Walk way and handrails.
  • Steel fence .
  • Steel bridges and grating.
  • Steel platform for loading arms.
Client EDIC
Commencement March 2015
Completion Feb 2018
Project Cost 125 million JD/ Our scope 3.2 million
Location Oil terminal - Aqaba

Aqaba New Port Phase 2&3

 

g1 Aqaba New Port covers area of approximately 600 Denim, include 5 berths of 240 meter for each one and extension for existing one 85 meter – combi wall – with one mooring dolphin and mooring buoy .

Project include :

  • Diaphragm wall 1200 m, height 32 meter by 9000 ton steel reinforcement and 120000 cubic meter concrete.
  • Capping Beam for 1285 m berths.
  • Combi wall piles and sheet piles 85 m, height 32 meter & precast elements.
  • Mooring dolphin & mooring buoy.
  • Fenders 185 pcs & Bollards 70 and ladders.
  • Apron slabs 40000 sqm , and rail beams.
  • Retaining wall and slope protection.
  • Infrastructure and services.
Client ADC ( Aqaba Development corp.)
Commencement Sep 2016
Completion March 2019
Project Cost 53.0 million JD / Our scope 30%
Location Aqaba new port – Aqaba south border