1-Design and Built Marina, Jetty for Al-HAQ hotel beach, build Breakwater and Dredging
2-Quay wall concrete blocks
3-built a new breakwater and rock beach protection from waves.
4-Supply new floating pontoon and jet ski.
5-Concrete ramp for boats.
6-Dredging 45000cu.m .
7-Jetty on piles
Client | AL-HAQ Hotel - Aqaba |
---|---|
Commencement | Jan 2019 |
Completion | February 2020 |
Project Cost | 2,8 million JD |
Location | Aqaba south beach |